CENTRAL LONDON · CRANED GARDEN ROOM

A garden room built off site.
Craned into Central London.

Restricted access. A steel base. One carefully planned arrival.

Costi and the TRJ team built this SIP garden room at a separate yard, then transported and craned it into an established London garden. Siberian larch, anthracite glazing and clay-plaster walls give the finished space a warm, simple character.

The completed garden room with larch slats and anthracite French doors
Location
Central London
Specified room size
5.0 m × 3.15 m
Construction
SIP room on a steel frame
Installation
Built off site · delivered by crane

01 / THE BRIEF

A new garden space.
A different way in.

The challenge was getting a complete garden building into a site with limited access. The agreed approach was to construct the room elsewhere and crane it over the garages into the garden, rather than assemble the whole building in its final position.

A purpose-made steel base supported the SIP structure during the off-site build and transport. Screw-pile foundations were specified for the garden position. The photographs record the fabrication yard, collection, road transport and the room suspended above the garden during installation.

The finished frontage faces the established planting and paved path. Vertical larch slats sit around central French doors and two tall windows, while the darker rear and side finishes recede against the boundaries.

02 / ORIGINAL FLOOR PLAN & STEEL FRAME

Designed as a room.
Built to be moved.

The original layout shows one open room, with central double doors and a fixed window on each side. The order specifies a nominal 5.0 m × 3.15 m room at 2.65 m high.

Original dimensioned room layout showing the open interior, central double doors and two front windows

A clear, open interior

The room has no internal partitions on the supplied layout. The front glazing brings daylight into the space and connects it to the garden path.

A separate steel-base design

The metal-frame drawing records a 4.9 m × 2.9 m base with transverse members, support plates and removable lifting points. Its footprint is distinct from the room size in the order.

Sizes above follow the order specification. The original layout and frame drawing retain their own detailed dimension labels.

View the original steel-frame drawing

The project-specific drawing below records the steel base beneath the SIP room.

Original 4900 mm by 2900 mm steel-base drawing showing crossmembers, support plates and removable lifting points
Clay-coloured interior walls, laminate floor and full-height glazing

03 / SPECIFICATION & FINISHES

Natural larch outside.
Clay plaster inside.

The exterior combines Siberian larch battens on the front with rendered board finishes to the other elevations. Anthracite aluminium glazing frames the view back into the garden.

Inside, the agreed finish was a 2 mm clay-plaster layer over plasterboard, left without paint. Laminate flooring and white skirting complete the simple interior.

Structure and foundations

SIP floor, wall and roof panels form the room on a welded steel base. The order specifies screw-pile foundations at the installation site, with the complete building transported from the separate build location.

Roof and rainwater

An EPDM membrane covers the roof. Rear drainage runs to a side downpipe and a 350-litre water butt, with black round guttering and downpipe.

Doors and windows

The order specifies 1,600 mm × 2,100 mm aluminium French doors and two fixed 700 mm × 1,700 mm windows in anthracite, with toughened argon-filled glazing and trickle vents.

External wall finishes

Siberian larch slats finish the front. The other elevations use cement-particle board with the agreed render upgrade. Membrane, battens and a ventilated wall arrangement sit behind the external finish.

Lighting and electrics

The electrical scope includes an independent consumer unit with RCBO and surge protection, two double sockets, two internal lights, two external wall lights and an extractor fan. The customer supplied the light fittings.

Interior comfort

Clay plaster, laminate flooring and white skirting finish the room. A spur and socket were specified for the customer-supplied wall radiator, alongside the armoured supply cable and final electrical connection.

04 / THE BUILD & CRANE INSTALLATION

From a steel frame
to a garden room.

The painted steel base frame before floor installation

01 · OFF-SITE CONSTRUCTION

Starting with the base

The painted steel frame receives the insulated floor panels. SIP walls, roof, glazing and finishes are assembled at the separate yard.

Aerial view of the room on its vehicle beside the London garden

02 · TRANSPORT TO LONDON

Moving the complete room

The finished room is collected by the lifting and transport vehicle and brought to the street beside the garden.

The complete garden room suspended over the garden during the crane installation

03 · INTO THE GARDEN

Lowering into position

The installation photographs show the room suspended over the garden before being lowered into its prepared location, beyond the garages.

05 / CUSTOMER FEEDBACK

Care in the details.

“Throughout the process Costi has been very meticulous, hard-working, diligent and prompt. He had solutions for every construction challenge.”

The customer’s feedback on the original project page praised the quality of the finished room and the team’s attention to the chosen materials.

07 / PROJECT QUESTIONS

A few useful answers.

Why was this garden room delivered by crane?

Access to the garden was restricted. The room was constructed at a separate site on a steel base, transported to London and craned over the intervening garages into the prepared garden position.

What size was specified?

The order specifies a nominal 5.0 m × 3.15 m room, 2.65 m high. The steel-base drawing separately records 4.9 m × 2.9 m. The original layout and base drawing retain their own dimension labels.

What finishes were chosen?

The project combines Siberian larch frontage, anthracite aluminium French doors and two fixed windows, an EPDM roof, clay-plaster interior walls and laminate flooring.

Was the garden room built on site?

The SIP structure and finishes were assembled at an off-site yard. The project photographs follow the steel frame, floor and wall assembly, transport and final crane installation.

YOUR NEXT PROJECT

Limited access?
Start with the site.

Tell us where you want to build and how the garden can be reached. We can discuss the layout, finishes and an installation approach suited to your site.

Explore our bespoke garden rooms, build process and planning guidance.